Issue permits for new utility connections (water and sewer).Issue permits for the installation or replacement of concrete curb and sidewalk in the public right of way.Improvements to the combined sewer collection system.Improvements to the water distribution system.Annual Resurfacing projects (milling and paving of streets) covered under NJDOT Local Aid.This office is responsible for overseeing the preparation of design documents as well as perform on-site inspections and prepares reports of all municipal capitol improvement projects such as: Issue Notices of Violation, Stop Work Orders and Unsafe Structure Notices when it is determined that provisions of the Uniform Construction Code have been violated.Issue Certificates of Approval or Certificates of Occupancy for projects which have been completed.Perform all required inspections in connection with permits.Issue construction permits and collect permit fees.Review all permit applications for completeness and verification of prior approvals.Provide construction applications and assistance to the public.The following activities are performed by this office: The staff consists of the construction official, sub code officials and assistants. This office is charged with the administration and enforcement of the Uniform Construction Code of the State of New Jersey.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |